عن الشركة

Mainstream Energy Solutions Limited (MESL) is the concessionaire of Kainji and Jebba Hydro Power Plants (HPP) with an installed capacity of 760MW and 578.4MW respectively and a total installed capacity of 1338.4MW.

NG
مجهول
مجهول
لم يتم التحقق من الشركة